                 
|

Planning to build or remodel? Don't Start Without Obtaining a Permit!
|
INSPECTRON INC., is the inspection agency performing plan reviews and construction inspections for Lynden Township.
All projects that create a new structure or change the floor plan, the foot print or roof line of an existing structure are required to have a plan submitted for review prior to issuance of a building permit and scheduling of inspections. A complete plan will include all information requested in the Building Permit Application Packet obtained from Inspectron, Inc. These plans will be reviewed for compliance with local ordinances and the Building Code. When approved, these plans will be the basis of permit issuance and inspection.
Inspectron office hours are 8:00 a.m. to 4:30 p.m. Monday through Friday. General questions and inspection requests should be directed to our toll free number at 1-800-322-6153. All inspections must have a 24 hour advance notice.
For your convenience Inspectron also has an office located in Waite Park across the street from the Waite Park City Hall. You may drop off or mail your completed permit application and pick up your issued permit at this office.
Inspectron Inc. offices are located at:
Inspectron, Inc.
4 13th Ave So.
Waite Park, MN 56387
and
Inspectron Inc.
15120 Chippendale Ave., Suite 104
Rosemount, MN 55068
We invite your written comments and questions about the services we provide to you. Please let us know what we do right or wrong.
Ron Wasmund, Building Official
Gary Utsch, Building Inspector
|
In response to questions that arose at the March 2008 annual meeting we offer this information about code and permit requirements.
Click Here
Inspectron Inc. has a new web site. Additional information will be added in the coming months. Click Here
|
Residential Building Permit Packet: Name and phone number of building inspector, refer to information at left.
• Submittal Requirements for Obtaining a Residential Building Permit
• Survey/Site Plan Requirements
• Permit Procedure
• Instructions for scheduling inspections
• Required Inspections Included
• Building Permit Application
This is a temporary surcharge only.
• Bldg. Fee Schedule
• MN Dept. of Labor & Industry
Fee Letter • Lynden Surcharge Increase Letter
|